Flood blocks alternative route at Dumkibas, disrupting Narayanghat-Butwal traffic
kathmandupost.com · Mon Jun 23 04:29:39 GMT 2025

New bridge over Binayi River expected to open mid-July.
Traffic along the Narayanghat-Butwal road section has been disrupted on Monday after the alternative route being used at Dumkibas was blocked due to flooding.
Read full story at source (kathmandupost.com)