Experts urge urgent stabilisation of Krishnabhir. Tunnel or bridge advised for long term fix
kathmandupost.com · Tue Sep 08 00:43:34 GMT 2026

Engineers and geologists warn that the temporary route built above the collapsed stretch remains vulnerable and needs immediate slope stabilisation treatment.
The new track constructed above the collapsed Krishnabhir section of the Prithvi Highway in Dhading should be strengthened immediately if it is to serve as more than a short-term escape route, say engineers and geologists. They warn that the unstable hillside in Krishnabhir remains a serious risk.
Read full story at source (kathmandupost.com)