Power generation from Upper Tamakoshi to resume by December 25
risingnepaldaily.com · Fri Dec 06 02:44:21 GMT 2024

By A Staff Reporter,Kathmandu, Dec.6: Power generation from the 456 MW Upper Tamakoshi, the largest of the operational hydropower projects, will resume by December 25 as per the maintenance schedule of the project.
Read full story at source (risingnepaldaily.com)