Flood-damaged Khimti transmission line to be brought into operation
risingnepaldaily.com · Mon Oct 21 00:24:44 UTC 2024

By A Staff Reporter,Kathmandu, Oct. 21 : The tower of Khimti-Lamosanghu 132 kV transmission line, which was swept away by the flood in the Tamakoshi River in the wake of incessant rains of September 28-29, will be brought into operation using the emergency restoration system (ESR) tower.
Read full story at source (risingnepaldaily.com)