Two Chinese firms shortlisted for Tamakoshi V project construction
kathmandupost.com · Thu Feb 02 01:35:00 GMT 2023
The 99.4MW project does not need its own dam, because it takes its water directly from the tailrace tunnel of the 456MW Upper Tamakoshi Hydroelectric Project.
Two Chinese companies have been shortlisted to construct the civil component of the Tamakoshi V hydropower project.
Read full story at source (kathmandupost.com)