Two-way traffic resumes in Gaindakot-based highway
english.ratopati.com
KAWASWATI, September 2: Two-way traffic has resumed along the East-West Highway that was obstructed after the monsoon-induced flood took away a diversion in Gaindakot Municipality-23 of Nawalpur.
The highway that was disrupted since last Thursday has come into operation after seven days. The road traffic had come to a halt when a diversion constructed in course of the East-West Highway widening drive was taken away by a flood.
Read full story at source (english.ratopati.com)