Upper Tamakoshi in final state, tunnel ready by April 21
english.khabarhub.com · Wed Apr 07 15:15:57 GMT 2021
(Image for Representation)
KATHMANDU: The ongoing Upper Tamakoshi Hydropower Project (456 MW) has reached the final stage of construction.
Read full story at source (english.khabarhub.com)