Construction of ‘iconic’ Narayani bridge begins after an 18-month delay
kathmandupost.com · Mon Dec 01 16:15:00 GMT 2025

The 420-metre bridge will have two 53-metre towers with a 10-metre clearance to allow vessels to pass underneath.
Construction of the long-awaited signature bridge over the Narayani river has finally begun a year and a half after the ceremonial groundbreaking of the ‘iconic bridge’.
Read full story at source (kathmandupost.com)