Skip to content

News

Economy

Rahughat Hydropower Project Begins Compensation Distribution for Tunnel Affected

english.ratopati.com · Thu Nov 05 02:18:10 UTC 2026

Myagdi. The process of distributing compensation to those affected by the tunnel of the 40 MW Rahughat Hydropower Project constructed in Myagdi by Nepal Electricity Authority's subsidiary company, Raghuganga Hydropower, has begun.

Compensation is being distributed to those whose houses were destroyed or cracked by the tremors from blasting during the excavation of the 6 km 270 m long tunnel connecting the dam at the foot of Dagnam in Raghuganga Rural Municipality-4 and the powerhouse at Tilkenichaur.

Read full story at source (english.ratopati.com)