Krishnabhir road reopens on Thursday
kathmandupost.com · Thu Sep 17 04:15:22 GMT 2026

After 18 days of closure, a new track cut above the flood-damaged section is now carrying traffic in both directions.
The Krishnabhir section of the Prithvi Highway in Dhading reopened to two-way traffic on Thursday, 18 days after torrential rain triggered flooding and landslides that caused the road to collapse.
Read full story at source (kathmandupost.com)