Muglin-Narayangadh Road Section Reopens After Mudslide
english.ratopati.com · Fri Sep 18 03:53:31 GMT 2026

Chitwan. The Muglin-Narayangadh road section, which was obstructed on one side due to mud falling onto the road from above at Kilometre 15, has been reopened for two-way traffic.
The road has been reopened for two-way traffic after the mud was removed, the Road Division Bharatpur informed.
Read full story at source (english.ratopati.com)