NEA working on winter power management
kathmandupost.com · Wed Sep 23 15:40:29 GMT 2026

Officials say there won’t be load-shedding this winter despite flood damage to hydropower infrastructure along Trishuli corridor.
Nepal Electricity Authority (NEA) has stepped up preparations to manage electricity demand and supply during the coming dry season after the Bhotekoshi flood on August 26 disrupted transmission infrastructure and hydropower generation in the Trishuli corridor.
Read full story at source (kathmandupost.com)