Breakthrough made in first tunnel of Fast Track
risingnepaldaily.com · Sat May 18 00:00:36 UTC 2024

By A Staff Reporter,Kathmandu, May 18 : Breakthrough has been made in a 1.43-km-long tunnel along the Kathmand-Tarai Madhes Fast Track (Expressway) Project on Friday.
Read full story at source (risingnepaldaily.com)