Bheri Babai hybrid project surges past half-way mark
kathmandupost.com · Thu Jul 07 01:35:00 GMT 2022
Under the inter-basin water transfer scheme, surplus water from the Bheri river will be redirected to the Babai river through a tunnel.
Around 56 percent of the physical works at the
Read full story at source (kathmandupost.com)