Bailey bridge installation begins along flood-damaged Galchhi-Betrawati road
english.onlinekhabar.com · Fri Oct 02 14:36:39 GMT 2026

Kathmandu, October 2
Installation of a Bailey bridge has begun at Betrawati along the flood-damaged Galchhi-Betrawati road section in Rasuwa after an alternative temporary track was opened.
Read full story at source (english.onlinekhabar.com)