Temporary Track Opens on Galchhi-Betrawati Road in Rasuwa After Flood Damage; Bailey Bridge Installation Begins
english.ratopati.com · Fri Oct 02 16:08:40 GMT 2026

Kathmandu. With the opening of a temporary track on the Galchhi-Betrawati road section damaged by floods in Rasuwa, the work of installing a bailey bridge over the Betrawati has started.
According to Infrastructure Development Minister Sunil Lamsal, along with the opening of the temporary track, necessary foundations and other processes for the construction of the bailey bridge were expedited. Currently, the foundations on both sides of the bailey bridge have been completed.
Read full story at source (english.ratopati.com)