Pressure shaft installed at Rahughat hydropower project tunnel
risingnepaldaily.com · Fri May 24 00:50:07 UTC 2024

By Our Correspondent,Myagdi (Beni), May 24: The 'Pressure Shaft' of the 40 MW Rahughat hydropower project under construction in Raghuganga Rural Municipality of Myagdi has been connected.
Read full story at source (risingnepaldaily.com)