Skip to content

News

National

Beli Bridge Installation Nears Completion in Betrawati

english.ratopati.com · Fri Oct 09 12:55:53 GMT 2026

Nuwakot. The installation of a 74-meter long bailey bridge over the Falakhu River in Betrawati, connecting Nuwakot and Rasuwa, has reached its final stage. The Nepali Army has supported the bridge's base to the abutment on the Rasuwa side (concrete wall built on both sides of the bridge that connects the bridge to the main road) on Friday.

Now, only the deck (metal sheet for vehicles to drive on) needs to be laid. This work will take a maximum of three days. The Nepali Army plans to bring this bailey bridge into operation before Ghatasthapana (October 12) and advance the work to facilitate movement towards Rasuwa.

Read full story at source (english.ratopati.com)