Installation of tunnel boring machine at Sunkoshi Marin project likely to begin in May
kathmandupost.com · Sat Jan 22 13:12:38 GMT 2022
The machine will gouge out a 13.3-km-long tunnel to bring water from the Sunkoshi River to the Bagmati River.
The installation of a tunnel boring machine at the Sunkoshi Marin Diversion Multipurpose Project in Sindhuli is expected to begin in May.
Read full story at source (kathmandupost.com)