Bhairahawa Airport Inaugurated
english.ratopati.com · Sun Oct 11 06:12:39 GMT 2026

Kathmandu. To facilitate the road traffic affected by the severe flood in the Bhote Koshi area on Bhadra 10, an Acro Bailey Bridge has been constructed and put into operation at Betrawati. The Bailey Bridge, constructed 45 days after the flood, was inaugurated today by the Nepali Army in a program. With the operation of the Bailey Bridge, it is expected that the road connection affected by the flood will be restored. It is believed that the operation of the bridge will provide relief to the local residents and the passengers and vehicles traveling through this road section. The flood in the Bhote Koshi area on Bhadra 10 had damaged road and bridge structures, affecting the transportation service in that area. The construction of the Bailey Bridge is expected to provide significant assistance in facilitating movement. Photo: Manis Aryal / Nepal Photo Library
Read full story at source (english.ratopati.com)