Bailey bridge at Betrawati restores road connectivity with Rasuwa
enewspolar.com · Sun Oct 11 12:42:23 GMT 2026

Nuwakot, Oct 11: The road connectivity with Rasuwa district, which was disrupted since August 26 Bhotekoshi flood, has been restored with the installation of a bailey bridge on Sunday.
The pre-fabricated truss bridge was fixed by the Nepali Army at Betrawati. It has established the road connection from Nuwakot to Rasuwa, thereby easing transportation activities.
Read full story at source (enewspolar.com)