Túin Construction Begins to Connect Nuwakot Headquarters
english.ratopati.com · Mon Aug 31 19:11:33 GMT 2026

Nuwakot. Túin construction has started with the aim of establishing contact with the headquarters of Nuwakot, Bidur.
The flood in the Trishuli River has washed away the bridge and damaged the road, disrupting road transport to Bidur and Rasuwa. Road transport to various areas of the district including Bidur and Rasuwa has been closed since Bhadra 10.
Read full story at source (english.ratopati.com)