Maldhunga Bridge Repair Intensifies After Flood Damage
english.ratopati.com · Mon Oct 12 03:52:27 GMT 2026

Baglung. The repair work of Maldhunga bridge, which was damaged due to the flood in the Kaligandaki river on last Ashoj 11, is being carried out at a rapid pace.
The operation of public transport services to Baglung and western Nepal has been completely affected as this bridge connecting Parbat and Baglung has been closed for 14 days.
Read full story at source (english.ratopati.com)