Federation of Contractors' Associations of Nepal Completes 268m Suspension Bridge in Nuwakot in One Month
english.ratopati.com · Thu Oct 15 04:27:32 GMT 2026

Kathmandu. To ease life after disaster, the Federation of Contractors' Associations of Nepal has completed the construction of a 268-meter-long suspension bridge over the Trishuli River in Nuwakot in a short period of one month.
The bridge, which directly connects Trishuli Bazaar and Dhunge Bazaar in Nuwakot, was washed away by the devastating flood that occurred on August 10. With the completion of the suspension bridge construction at that location, it will be fully operational from tomorrow. With the objective of facilitating the movement of citizens affected by the disaster and providing immediate relief, the Federation had decided to construct this bridge with its own funds.
Read full story at source (english.ratopati.com)