Motorboats resume operating in Narayani river
risingnepaldaily.com · Sat Oct 29 05:48:56 GMT 2022
Bharatpur, Oct. 29: Motorboats have started operating in Narayani river after the rains subsided. Operation of motorboats had been stopped after the water flow increased and they resumed along with the festivals.
Read full story at source (risingnepaldaily.com)