Construction in full swing at dry ports despite lockdown
kathmandupost.com · Mon May 10 13:11:12 GMT 2021
Chobhar inland container depot is being built with a Rs1.70 billion loan from the World Bank.
Construction crews are busy at work at the building sites of two key dry ports in Kathmandu and Rasuwa, exempt from the lockdown that has immobilised the rest of the country.
Read full story at source (kathmandupost.com)