Simkot going through 14-hour daily power cuts
risingnepaldaily.com · Mon Feb 19 00:53:15 GMT 2024
By Our Correspondent,Humla Feb. 19 : Hildum Power Distribution Centre has increased the load shedding time to 14 hours a day. The daily load-shedding hours have been increased after decreasing electricity generation due to reduced water level in the river.
Read full story at source (risingnepaldaily.com)