India likely to fund power line along Postal Highway
kathmandupost.com · Sun Aug 13 01:37:32 GMT 2023
Nepal Electricity Authority has sought around $700 million of the unused $750 million line of credit-4 that was meant for post-earthquake reconstruction.
The state-run Nepal Electricity Authority (NEA) is likely to build transmission lines along Nepal’s two national highways that span the country’s length.
Read full story at source (kathmandupost.com)