Repair work on collapsed Kamaladi road section underway (Pictures)
en.setopati.com · Mon Oct 28 11:43:00 UTC 2024

Repair work is underway on a road section in Kamaladi that had caved in more than two months ago.
The road section had collapsed on August 9. DG Prakash Construction of Kathmandu was awarded the contract for repairing the road on September 14.
Read full story at source (en.setopati.com)