Construction work of Siddhababa tunnel begins
risingnepaldaily.com · Wed Jan 24 00:17:10 GMT 2024
By Rekhiram Rana,Tansen, Jan. 24: Almost 22 months after the signing of the project, construction of the 1.126 km long Siddhababa tunnel way connecting Butwal and Palpa has begun.
Read full story at source (risingnepaldaily.com)