Nepal Army Builds Acro-Bridge in Nuwakot After Flood Damage
english.ratopati.com · Sun Sep 06 03:21:41 GMT 2026

Nuwakot. Due to the flood that came on Bhadra 10, most of the bridges in the Trishuli river have been washed away, affecting transportation and movement in various areas of Nuwakot. The Nepali Army has intensified the work of constructing an acro-bridge to restore movement after the flood also damaged the Tadi river bridge and road structure in Devighat of Bidur Municipality-5.
The engineering force of the Nepali Army has intensified the work of constructing an acro-bridge over the Tadi river in Devighat of Bidur Municipality 5, Nuwakot. After the flood damaged the road and bridge, the army is constructing a 60-meter long, 5.5-meter wide, and 50-ton load-bearing capacity acro-bridge to facilitate movement in the affected area.
Read full story at source (english.ratopati.com)