Breakthrough made in Rahughat Hydro tunnel
risingnepaldaily.com · Fri Feb 23 00:56:58 GMT 2024
By Thakur Prasad Acharya Myagdi (Beni) Feb. 23: The tunnel connecting the second and third adit, which is considered to be the longest in the 40 MW Rahughat hydropower project, has seen a breakthrough.
Read full story at source (risingnepaldaily.com)