Skip to content
S

Syafrubesi

english.onlinekhabar.com4 days ago

Syafrubesi bridge reopens

Kathmandu, November 9 The Syafrubesi bridge in Rasuwa, damaged by the Bhadau 10 flood, has reopened after reconstruction was completed. The bridge was rebuilt in just three days through the joint...

myrepublica.nagariknetwork.com3 weeks ago

Bailey bridge work speeds up in Syafrubesi ahead of Tihar

KATHMANDU, Oct 25: Construction of a Bailey bridge capable of carrying vehicles is progressing rapidly in Syafrubesi, with the National Disaster Risk Reduction and Management Authority and the loca...

risingnepaldaily.com11 weeks ago

Bhotekoshi flood: 60 employees hired for Langtang Khola Hydroelectric Project go missing

Kathmandu, Aug 26: A total of 60 employees including an engineer, working for the under-construction 20 MW Langtang Khola Hydroelectric Project based in Syafrubesi of Rasuwa have gone missing follo...

english.onlinekhabar.com11 weeks ago

Floods after lake burst reach Syafrubesi, urge caution

Kathmandu, August 28 Floodwaters triggered by the bursting of a large lake near the confluence of the Chochen Khola and Purepu Tsangpo rivers in China have reached Syafrubesi in Rasuwa. According...

myrepublica.nagariknetwork.com3 weeks ago

Bailey bridge work speeds up in Syafrubesi ahead of Tihar

KATHMANDU, Oct 25: Construction of a Bailey bridge capable of carrying vehicles is progressing rapidly in Syafrubesi, with the National Disaster Risk Reduction and Management Authority and the loca...

risingnepaldaily.com11 weeks ago

Bhotekoshi flood: Government has expedited search and rescue, reassures PM

Kathmandu, Aug 26: The government has immediately stepped up the rescue, search, and relief operations for the victims after the massive flood occurred in areas like Syafrubesi and Timure in Rasuwa...

english.onlinekhabar.com11 weeks ago

Let us who survived help the victims of the Himalayan tsunami

The devastation caused by the Bhotekoshi and Trishuli rivers, which began in the Syafrubesi and Timure areas, has been felt as far as the Terai region of central Nepal. Based on the damage reports,...

myrepublica.nagariknetwork.com11 weeks ago

60 workers at Langtang Khola Hydropower Project missing after  Rasuwa flood

KATHMANDU, Aug 26: At least 60 employees including engineers working at the under-construction 20 MW Langtang Khola Hydropower Project in Syafrubesi, Rasuwa, have gone missing following the Bhoteko...