
Rasuwa, Sept 29: Thirteen child-friendly centres have been set up in different parts of the district to protect children affected by disasters and support their psychosocial development.

Rasuwa. Thirteen child-friendly centers have been established in various places in the district for the protection and psychosocial development of children affected by disasters. The Nepal Red Cro...

On the morning of August 26, 2026, Nepal’s Rasuwa district experienced an appalling disaster. It shook the nation and raised serious international concerns, as citizens of dozens of countries were ...

Tetangche, September 23 The kitchen in Selkar Tamang’s home has gone quiet. Tamang lives with six other members of his family in Tetangche, a remote settlement in Ward 5 of Aamachhodingmo Rural Mu...

Twenty-four days after the Bhotekoshi floods, Rasuwa and Nuwakot remain cut off from each other, while Dhading district headquarters also lacks a direct road link. Mud, unstable ground and steep c...

Rasuwa, Sept 29: Thirteen child-friendly centres have been set up in different parts of the district to protect children affected by disasters and support their psychosocial development.

Rasauwa. Special religious pujas and Chhyoikar week have been completed in Syabrubesi and Sano Bharkhu of Rasuwa, praying for the eternal peace of the souls of citizens who lost their lives due to ...

On the morning of August 26, 2026, Nepal’s Rasuwa district experienced an appalling disaster. It shook the nation and raised serious international concerns, as citizens of dozens of countries were ...

Kathmandu, September 21 The government has decided not to establish a new authority for the reconstruction of infrastructure damaged by the Rasuwa-Bhotekoshi floods. Infrastructure Development Mi...

The discovery comes three weeks after devastating floods hit Rasuwa and left people missing inside the hydropower project. Five bodies were recovered on Wednesday from the 216-megawatt Upper Trish...

By Ajay Shah, Mahottari, (Gaushaha), Sept. 23: The devastating flood and landslides that struck Rasuwa on August 26 have left nine families in Mahottari feeling as though time has stood still. With...

Kathmandu. The Japanese government has provided an emergency grant of 1 million US dollars for the assistance of flood and landslide victims in Rasuwa, Nuwakot, and Dhading districts of central Nep...

KATHMANDU, Sept 23: The World Wildlife Fund (WWF) Nepal has handed over 15 million rupees in aid for the rescue, relief, and rehabilitation of those affected by the Bhote Koshi floods in Rasuwa.

Rasuwa, September 19 Eleven more bodies have been recovered from the Upper Trishuli-1 Hydropower Project site on Saturday. The Nepal Army said the bodies were found entangled in nets and buried u...

Rescuers discovered the bodies while searching tunnels for people missing since the August 26 floods. Five bodies have been found inside the Chilime hydropower project in Rasuwa district, the Nepa...

Kathmandu, Sept. 19: The risk of infectious diseases has increased in the flood-affected areas of Rasuwa, with at least 81 cases of diarrhoea recorded in recent days. New cases of diarrhea have als...

Nuwakot. There are no settlements currently in Khalde, Satbise, and Naubise of Uttargaya Rural Municipality-5 in Rasuwa. Khalde, where settlements were expanded in search of a safe life after being...

KATHMANDU, Sept 18: Six bodies have been recovered from a tunnel of the Upper Trishuli-3A Powerhouse in Rasuwa during an ongoing search for people who went missing after the Bhotekoshi floods.

Kathmandu, September 17 A parliamentary special committee is set to be formed to address issues related to the disaster caused by the Bhotekoshi floods in Rasuwa and the broader challenges posed b...

By A Staff Reporter, Kathmandu, Sept. 17: Four bodies and a human body part have been recovered from the underground powerhouse of the Chilime Hydropower Project in Rasuwa, which was damaged by the...

Kathmandu. The aftermath of the devastation caused by the floods in the Bhote Koshi and Trishuli rivers on August 10th still lingers in the courtyards of the victims in Rasuwa and Nuwakot districts...

KATHMANDU, Sept 17: Climate change has created conditions that contributed to the devastating ice-rock avalanche and subsequent flooding in Rasuwa on September 10 by gradually weakening the high-mo...

Kathmandu, September 16 Two bodies have been found inside a tunnel of the Chilime Hydropower Project in Rasuwa during an ongoing search and rescue operation. Rasuwa Chief District Officer Kamal P...

After the Bhotekoshi flash flood in Rasuwa, Nuwakot, Dhading and Chitwan left a trail of deaths and destruction almost three weeks ago, the government faces a monumental reconstruction task in the ...

Janakpurdham. More than fourteen hundred people have died and more than 4,000 are missing in the devastating flood in BhoteKoshi, Rasuwa, on the 10th of Bhadra. Search and rescue operations immedia...

KATHMANDU, Sept 16: The government has constituted a seven-member expert study committee to find out the scientific basis and evidence of the floods in the Bhotekoshi river of Rasuwa.

Kathmandu. The National Disaster Risk Reduction and Management Authority has estimated that US$4.77 billion is required for the reconstruction and rehabilitation of damage caused by the Rasuwa floo...

KATHMANDU, Sept 16: A joint search and rescue team, including foreign personnel, has found four bodies inside a tunnel of the Chilime Hydropower Project in Rasuwa, where people have been trapped si...

Kathmandu. A devastating flood on Bhadra 10 has confirmed 39 deaths in the 216 MW Upper Trishuli-1 Hydropower Project under construction in Rasuwa. 439 people are still missing. The details of suc...

Kathmandu. The devastating Rasuwa flood that occurred on September 10 has raised serious questions about the existing disaster early warning system in the Himalayan region. The Rasuwa flood, which...

Kathmandu. One hundred students studying at Nilkantha Secondary School, Bogatitar in Uttargaya Rural Municipality Ward No. 5 of Rasuwa are missing. The exact number of missing students has not yet ...

Rasuwagadhi. In the search for persons who went missing from the Upper Trishuli-1 Hydropower Project due to the devastating flood in BhoteKoshi of Rasuwa on Bhadra 10, 11 more bodies have been foun...

Rasuwa. The bodies of five employees trapped in the Chilime Hydropower Center have been handed over to their respective families today. According to Baburaja Maharjan, Managing Director of Chilime ...

Kathmandu. The recent Rasuwa Bhote Koshi disaster has created a situation where Nepal has to rethink the development concept of prosperity that it has been advancing in the last decade, said Foreig...

Kathmandu. Political parties represented in parliament are going to urge the government to name the floodwaters that came from China's Tibet via Rasuwa's Bhote Koshi on Bhadra 10. Discussion was he...