Trishuli-3A cable duct cleared of 20,000 cubic metres of debris after Bhotekoshi flood
english.onlinekhabar.com · Thu Sep 03 03:03:53 GMT 2026

Kathmandu, September 3
Efforts to clear the entrance to the 160-metre-long cable duct tunnel of the Trishuli-3A Hydropower Project have been intensified following the devastating Bhotekoshi flood in Rasuwa on August 26.
स्रोतमा पूरा पढ्नुहोस् (english.onlinekhabar.com)